Skip to content
New York Reserve StudiesGet a quote
Menu

Reserve study pricing in New York

Fees here run above the national picture for one reason: city buildings have more to inspect. This page shows what drives the price, so you can compare proposals line by line.

Get a quote

Why we do not quote a dollar range

We only publish prices from government agencies or national trade and professional bodies. None of them, including the Community Associations Institute and the Association of Professional Reserve Analysts, publishes reserve study fees for New York. Ranges you see elsewhere come from firms selling studies. Rather than repeat them, we will get you a real proposal for your building.

Treat any number you are given as a guide, not a quote, until a provider has seen your documents.

Eight things that move the fee

Roughly in order of how much they matter for a city building.

Height and facade

A building over six stories has a FISP facade, and the study has to read the last report and price the next two cycles. Masonry, terra cotta and balconies add hours.

Mechanical plant

Boilers, fuel systems, cooling towers, pumps and elevators each need a life and a cost. A steam plant with oil backup takes more work than a building on individual heat pumps.

Garage and site

A parking structure brings a Local Law 126 report and slab, waterproofing and drainage items. Garden complexes add paths, retaining walls and site lighting.

Number of buildings

A garden co-op with twelve buildings on one lot is twelve roofs and twelve boiler rooms to inspect, even with the same unit count as one tower.

Records on hand

Drawings, past capital work, contracts and the last study shorten the site visit. Missing records mean the provider measures and estimates from scratch.

Level of service

Whether you need a full study, a revisit-and-update or a desk refresh, the three levels CAI's standards define. Each step down is less work and a lower fee.

Funding analysis asked for

A single funding plan costs less than one that compares reserves against an assessment and a mortgage refinance, which co-op boards often want.

Board meetings

Presenting the draft to the board and answering shareholder questions is time the proposal should list, not an extra later.

The three levels of service

LevelWhat the provider doesWhen it fits a New York buildingRelative fee
Full studyBuilds the component inventory, inspects on site, estimates life and cost, writes a funding plan.No study before, a sponsor-era study, or major work since the last one.Highest
Update with site visitChecks the existing inventory on site, revises lives and costs, reruns the funding plan.The study is three to five years old, or a FISP report has changed the picture.Middle
Update without site visitRevises costs, balances and the funding plan from records only.Between site visits, for the annual budget.Lowest
Levels as defined in CAI's Reserve Study Standards. Relative fee is our ordering of the work involved, a guide, not a quote.

Comparing two proposals

  • Same component list. If one leaves out the garage or the gas risers, it is cheaper because it does less.
  • Same documents read: FISP, Local Law 152, Local Law 126, Local Law 97 report.
  • Who visits. A licensed engineer or architect, a credentialed reserve specialist, or both.
  • How many years the plan runs, and whether it shows inflation and interest assumptions.
  • What an update will cost in three years. Locking that now is worth asking for.

Who pays and how

The corporation or the condominium engages the provider, and the board approves the contract as it would an engineer's. Whether the invoice is charged to the operating budget or to reserves is an accounting choice; ask your auditor before the board votes.

Read the rules that apply to co-ops and condos

Start a quote request for your building

Tell us the building, your seat on it and when the last plan was done. Within one business day we come back with a reserve study provider that works in your borough or county, and their proposal comes to you, not to a list.

We are an introduction service, not a reserve study firm. The provider pays us for the introduction; the board pays nothing extra for using this form. Your details go to that provider only after you say yes.

1 of 3

The building
Get a quote